• One 100×80 mm FR4 insulating part, qty 500, sent to three fabricators with a 2D PDF only: quotes come back at USD 2.10 / 3.40 / 4.85 per piece — the highest is 2.3× the lowest. Add a STEP file plus a fully annotated 2D drawing, and the same three quotes converge to USD 1.42–1.54, a spread of just 9%.
  • Nobody is cheating. The thinner your documents, the bigger the risk premium each supplier adds for "what the drawing doesn't say." In this example the three premiums are 30%, 70%, and 140%. You are not comparing prices; you are comparing three guesses.
  • Run the DFM review before the RFQ. Review after quoting voids the first round of quotes and costs 3–5 business days per re-quote cycle. Review after the PO means a formal change order: USD 120–380 per event plus a 15–35% unit-price uplift — the saving gets eaten by the process.
  • Two review depths, two breakeven points: light review (annotations only, ~2 hours / USD 90) breaks even at 173 pieces; the full 12-change revision (USD 450) breaks even at 372 pieces.
  • Holding only a physical sample or photos? Don't quote yet — dimension the sample first. Quoting on guessed dimensions and scrapping the batch is the most expensive route.

1. Where the 2.3× Spread Comes From

Send the same 2D-PDF-only drawing (no STEP, no default-tolerance block, twenty dimensions all ±0.05, two non-standard slots) to three shops that machine FR4:

Supplier Quote (USD/pc) How they handle the missing information Implied risk premium
A2.10Quotes on the most common assumptions, notes "subject to drawing confirmation"+30%
B3.40Adds one safety margin each for slots, tolerance, and fixturing+70%
C4.85Prices the worst case on every unknown; would rather lose the job than carry the risk+140%

Same drawing, USD 2.75 per piece apart — USD 1,375 across a 500-piece lot. Buyers typically respond in two wrong ways. One: collect a fourth and fifth quote — the spread will not converge, because the missing documents stay missing. Two: squeeze supplier A's price — the discount returns later as "drawing confirmation fees" and "tooling charges", line by line.

The spread itself is a diagnostic. When three quotes differ by more than ±30%, fix the documents before you keep comparing prices.

2. Three Document Tiers Decide the Workflow

Tier What you hold Quote spread (same part) Execution risk Recommended sequence
ASTEP 3D + fully annotated 2D (default-tolerance block, datums)±5% (1.42–1.54)Low — straight into production planningQuote → order
B2D PDF only, no default-tolerance block, incomplete callouts> ±60% (2.10–4.85)Medium — prototype rework possibleLight review first → quote
CPhysical sample or photos only, no drawing> ±100% (3.20–4.60)High — dimensions reverse-engineeredDimension the sample, draw it → quote

Tier B is the most common: a drawing exists, but no STEP, no default-tolerance block, unclear datums. You *can* quote it — you just shouldn't expect the quotes to agree. A two-hour light review (Section 4) lifts Tier B to Tier A. It is the highest-leverage two hours in the whole RFQ process.

Don't gamble with Tier C. Quoting from a sample gives USD 3.20–4.60. Dimension the part with calipers, draw it to the "routinely achievable" tier of article 85 (outline ±0.20, hole dia ±0.10, hole position ±0.15, flatness 0.4 mm/100 mm, chamfer ±0.20), and the same part quotes around USD 1.58. Half a day with calipers saves the whole-lot price gap.

3. Where You Put the Review Changes Supplier Behavior

DFM review position What suppliers do Cost to you
Before the RFQ (review findings sent with the RFQ)All three quote the same explicit drawing, directly comparable; some will run a free DFM check for you2–10 in-house engineering hours
After quoting, before the POSuppliers treat re-quoting as a re-pricing opportunity — or simply don't re-quote and say "we'll see later"3–5 business days per re-quote cycle; comparability lost
After the POFormal change order (ECN): USD 120–380 per event, unit price up 15–35%, delivery pushed55–80% of the saving consumed by process

The third row is the most expensive mistake. The technical saving of the drawing change is unchanged — the machining hours still disappear — but you now pay for it at "change order" prices. The same tolerance grading that reduces cost before the RFQ *increases* cost after the PO.

4. Two Review Depths, Two Breakeven Points

Depth What it covers Investment Unit-price saving (this part) Breakeven
Light reviewAnnotations only: add default-tolerance block, grade tolerances (keep critical, relax the rest to the article-85 routine tier), map non-standard holes/slots to standard tools, add datums~2 h ≈ USD 902.10 → 1.58, saving USD 0.52/pc90 ÷ 0.52 ≈ 173 pcs
Full revisionLight review + the 12 changes of draft 95 (nesting four-up, removing sub-thickness micro-holes, fixturing, etc.)~USD 4502.63 → 1.42, saving USD 1.21/pc450 ÷ 1.21 ≈ 372 pcs (from draft 95)

Simple usage rule: below 173 expected pieces, skip even the light review — quote as-is and accept the spread. Between 173 and 370, do the light review. Above 370 — or for any part that will be reordered — do the full revision. The two are not alternatives: the light review is the first six items of the full twelve.

5. Four Failure Modes (Most Frequent First)

  1. "Get quotes first, review later." Round-one quotes rest on thin documents; once the review lands,

all three quotes are void and re-quoting costs 3–5 business days. On a schedule-driven project, that one cycle burns the window (rush-order premiums are a separate tax — see article 91).

  1. The locked-price trap. Supplier quotes on the original drawing with "price firm for 90 days";

the buyer revises the drawing afterwards. The saving must now travel through a change order at +15–35% — more expensive than never revising.

  1. Quoting from Tier C. Reverse-engineered dimensions turn out out-of-tolerance at first article →

the lot is scrapped. On this part: 500 pcs × USD 4 ≈ USD 2,000 plus re-make lead time — enough to dimension ten samples properly.

  1. Comparing prices while ignoring spread. Chasing a fourth and fifth quote at 2.3× spread only adds

more guesses. Compress the spread by fixing the documents, *then* compare.

6. FAQ

Q1 — A supplier offers free DFM feedback — does that replace our own review?
Partly. Free DFM covers what the quoting side's own capacity cares about; a shop whose laser can't do tight hole-to-edge won't flag it. Do the two-hour annotation pass yourself, then let suppliers cross-check — together they are complete.

Q2 — Will a STEP file leak the design?
FR4/phenolic insulators are almost always mechanical parts with no styling IP to protect. If cautious, send a simplified STEP (detail features removed) with the full 2D — quote accuracy barely suffers. Encrypting the 2D as well is a deliberate choice of Tier B spread.

Q3 — Is there time for a review on a rush job?
Rush jobs need the light review *more*, not less: two hours replaces a 3–5 day re-quote loop. What genuinely doesn't fit is the full revision — lock the annotations now, leave the structural changes of the 12-item list for revision 2.

Q4 — Does the 173-piece breakeven use order quantity or annual volume?
Use the total quantity expected on the same drawing. If the part will be reordered, a 100-piece first order still justifies the light review — USD 90 amortizes across 200 pieces in two orders.

Q5 — What spread is normal?
Same Tier-A documents: ±5–10% across three shops is normal competition. Above ±20%, something in the drawing is still ambiguous. Above ±30%, stop quoting and fix the documents.

7. Put the Review Ahead of the Quote

Before your next RFQ, run this checklist: ① Which tier are your documents — A, B, or C? ② Below 173 expected pieces, skip the light review; above that, spend two hours adding the default-tolerance block and grading tolerances (aligned to the article-85 routine tier). ③ Send the review findings with the RFQ. ④ When quotes arrive, check the spread first — beyond ±30%, fix documents before comparing prices.

Chaorong Electronics offers free DFM pre-review for FR4 / G10 / phenolic / carbon-fiber machined parts: send a STEP or 2D drawing to dggbsr@163.com and receive grading recommendations plus a routinely-achievable tolerance confirmation within 2 business days, with comparative quotes across two processes.

Related reading: The 12-Item RFQ Checklist for Custom Machined Insulation Parts — the upstream of this article · Machining Tolerances for FR4, G10 and Phenolic — the tolerance grading the light review adds · CNC Routing vs Laser vs Die Cutting · Lead Time and MOQ for Custom Insulation Parts · First-Lot Release: Sampling Plans and Cpk Thresholds — the gate after the review · Custom Machining & Fabrication