- One 100×80 mm FR4 insulating part, qty 500, sent to three fabricators with a 2D PDF only: quotes come back at USD 2.10 / 3.40 / 4.85 per piece — the highest is 2.3× the lowest. Add a STEP file plus a fully annotated 2D drawing, and the same three quotes converge to USD 1.42–1.54, a spread of just 9%.
- Nobody is cheating. The thinner your documents, the bigger the risk premium each supplier adds for "what the drawing doesn't say." In this example the three premiums are 30%, 70%, and 140%. You are not comparing prices; you are comparing three guesses.
- Run the DFM review before the RFQ. Review after quoting voids the first round of quotes and costs 3–5 business days per re-quote cycle. Review after the PO means a formal change order: USD 120–380 per event plus a 15–35% unit-price uplift — the saving gets eaten by the process.
- Two review depths, two breakeven points: light review (annotations only, ~2 hours / USD 90) breaks even at 173 pieces; the full 12-change revision (USD 450) breaks even at 372 pieces.
- Holding only a physical sample or photos? Don't quote yet — dimension the sample first. Quoting on guessed dimensions and scrapping the batch is the most expensive route.
1. Where the 2.3× Spread Comes From
Send the same 2D-PDF-only drawing (no STEP, no default-tolerance block, twenty dimensions all ±0.05, two non-standard slots) to three shops that machine FR4:
| Supplier | Quote (USD/pc) | How they handle the missing information | Implied risk premium |
|---|---|---|---|
| A | 2.10 | Quotes on the most common assumptions, notes "subject to drawing confirmation" | +30% |
| B | 3.40 | Adds one safety margin each for slots, tolerance, and fixturing | +70% |
| C | 4.85 | Prices the worst case on every unknown; would rather lose the job than carry the risk | +140% |
Same drawing, USD 2.75 per piece apart — USD 1,375 across a 500-piece lot. Buyers typically respond in two wrong ways. One: collect a fourth and fifth quote — the spread will not converge, because the missing documents stay missing. Two: squeeze supplier A's price — the discount returns later as "drawing confirmation fees" and "tooling charges", line by line.
The spread itself is a diagnostic. When three quotes differ by more than ±30%, fix the documents before you keep comparing prices.
2. Three Document Tiers Decide the Workflow
| Tier | What you hold | Quote spread (same part) | Execution risk | Recommended sequence |
|---|---|---|---|---|
| A | STEP 3D + fully annotated 2D (default-tolerance block, datums) | ±5% (1.42–1.54) | Low — straight into production planning | Quote → order |
| B | 2D PDF only, no default-tolerance block, incomplete callouts | > ±60% (2.10–4.85) | Medium — prototype rework possible | Light review first → quote |
| C | Physical sample or photos only, no drawing | > ±100% (3.20–4.60) | High — dimensions reverse-engineered | Dimension the sample, draw it → quote |
Tier B is the most common: a drawing exists, but no STEP, no default-tolerance block, unclear datums. You *can* quote it — you just shouldn't expect the quotes to agree. A two-hour light review (Section 4) lifts Tier B to Tier A. It is the highest-leverage two hours in the whole RFQ process.
Don't gamble with Tier C. Quoting from a sample gives USD 3.20–4.60. Dimension the part with calipers, draw it to the "routinely achievable" tier of article 85 (outline ±0.20, hole dia ±0.10, hole position ±0.15, flatness 0.4 mm/100 mm, chamfer ±0.20), and the same part quotes around USD 1.58. Half a day with calipers saves the whole-lot price gap.
3. Where You Put the Review Changes Supplier Behavior
| DFM review position | What suppliers do | Cost to you |
|---|---|---|
| Before the RFQ (review findings sent with the RFQ) | All three quote the same explicit drawing, directly comparable; some will run a free DFM check for you | 2–10 in-house engineering hours |
| After quoting, before the PO | Suppliers treat re-quoting as a re-pricing opportunity — or simply don't re-quote and say "we'll see later" | 3–5 business days per re-quote cycle; comparability lost |
| After the PO | Formal change order (ECN): USD 120–380 per event, unit price up 15–35%, delivery pushed | 55–80% of the saving consumed by process |
The third row is the most expensive mistake. The technical saving of the drawing change is unchanged — the machining hours still disappear — but you now pay for it at "change order" prices. The same tolerance grading that reduces cost before the RFQ *increases* cost after the PO.
4. Two Review Depths, Two Breakeven Points
| Depth | What it covers | Investment | Unit-price saving (this part) | Breakeven |
|---|---|---|---|---|
| Light review | Annotations only: add default-tolerance block, grade tolerances (keep critical, relax the rest to the article-85 routine tier), map non-standard holes/slots to standard tools, add datums | ~2 h ≈ USD 90 | 2.10 → 1.58, saving USD 0.52/pc | 90 ÷ 0.52 ≈ 173 pcs |
| Full revision | Light review + the 12 changes of draft 95 (nesting four-up, removing sub-thickness micro-holes, fixturing, etc.) | ~USD 450 | 2.63 → 1.42, saving USD 1.21/pc | 450 ÷ 1.21 ≈ 372 pcs (from draft 95) |
Simple usage rule: below 173 expected pieces, skip even the light review — quote as-is and accept the spread. Between 173 and 370, do the light review. Above 370 — or for any part that will be reordered — do the full revision. The two are not alternatives: the light review is the first six items of the full twelve.
5. Four Failure Modes (Most Frequent First)
- "Get quotes first, review later." Round-one quotes rest on thin documents; once the review lands,
all three quotes are void and re-quoting costs 3–5 business days. On a schedule-driven project, that one cycle burns the window (rush-order premiums are a separate tax — see article 91).
- The locked-price trap. Supplier quotes on the original drawing with "price firm for 90 days";
the buyer revises the drawing afterwards. The saving must now travel through a change order at +15–35% — more expensive than never revising.
- Quoting from Tier C. Reverse-engineered dimensions turn out out-of-tolerance at first article →
the lot is scrapped. On this part: 500 pcs × USD 4 ≈ USD 2,000 plus re-make lead time — enough to dimension ten samples properly.
- Comparing prices while ignoring spread. Chasing a fourth and fifth quote at 2.3× spread only adds
more guesses. Compress the spread by fixing the documents, *then* compare.
6. FAQ
Q1 — A supplier offers free DFM feedback — does that replace our own review?
Partly. Free DFM covers what the quoting side's own capacity cares about; a shop whose laser can't do tight hole-to-edge won't flag it. Do the two-hour annotation pass yourself, then let suppliers cross-check — together they are complete.
Q2 — Will a STEP file leak the design?
FR4/phenolic insulators are almost always mechanical parts with no styling IP to protect. If cautious, send a simplified STEP (detail features removed) with the full 2D — quote accuracy barely suffers. Encrypting the 2D as well is a deliberate choice of Tier B spread.
Q3 — Is there time for a review on a rush job?
Rush jobs need the light review *more*, not less: two hours replaces a 3–5 day re-quote loop. What genuinely doesn't fit is the full revision — lock the annotations now, leave the structural changes of the 12-item list for revision 2.
Q4 — Does the 173-piece breakeven use order quantity or annual volume?
Use the total quantity expected on the same drawing. If the part will be reordered, a 100-piece first order still justifies the light review — USD 90 amortizes across 200 pieces in two orders.
Q5 — What spread is normal?
Same Tier-A documents: ±5–10% across three shops is normal competition. Above ±20%, something in the drawing is still ambiguous. Above ±30%, stop quoting and fix the documents.
7. Put the Review Ahead of the Quote
Before your next RFQ, run this checklist: ① Which tier are your documents — A, B, or C? ② Below 173 expected pieces, skip the light review; above that, spend two hours adding the default-tolerance block and grading tolerances (aligned to the article-85 routine tier). ③ Send the review findings with the RFQ. ④ When quotes arrive, check the spread first — beyond ±30%, fix documents before comparing prices.
Chaorong Electronics offers free DFM pre-review for FR4 / G10 / phenolic / carbon-fiber machined parts: send a STEP or 2D drawing to dggbsr@163.com and receive grading recommendations plus a routinely-achievable tolerance confirmation within 2 business days, with comparative quotes across two processes.
Related reading: The 12-Item RFQ Checklist for Custom Machined Insulation Parts — the upstream of this article · Machining Tolerances for FR4, G10 and Phenolic — the tolerance grading the light review adds · CNC Routing vs Laser vs Die Cutting · Lead Time and MOQ for Custom Insulation Parts · First-Lot Release: Sampling Plans and Cpk Thresholds — the gate after the review · Custom Machining & Fabrication