The decision: the sample is approved, the first 2,000-piece lot has arrived. Do you gauge every piece, pull 125 pieces to AQL, or accept the supplier's inspection report and skip-lot?

The one-line answer: the choice has very little to do with how strictly you inspect and a great deal to do with whether the defects are process-wide or batch-wide. Sampling cannot catch a process that sits 0.03 mm off centre — it rejects such a lot only 0.80% of the time. It catches a batch accident superbly — 99.99% rejection. So the right move is not to pick a tier, but to look at where Cpk sits:

Cpk (measured, ≥3 lots of data) Release method Annual cost (2,000 pcs/lot × 6 lots)
≥ 1.33Skip-lot + 5-piece check every 3rd lotUSD 10
0.71 – 1.33AQL sampling n=125 / Ac=3 / Re=4USD 1,170
< 0.71100% inspection, and start fixing the processUSD 2,716

But the money is not in that column. Lifting Cpk from 0.83 to 1.33 by re-shimming a die costs USD 380 once, saves USD 975 a year, and pays back in 2.3 lots. Inspection is a tourniquet, not surgery. That is the sentence worth taking away.

1. Price the inspection before you argue about it

Arguing 100% vs sampling without a per-piece inspection cost is arguing about nothing.

The part used throughout: FR4 3240 insulation spacer, OD 20 mm / ID 10.5 mm / 1.6 mm thick, USD 1.42/pc (the post-DFM figure), first lot 2,000 pcs, annual volume 12,000 pcs (6 lots).

Three gauging steps: calliper on OD, plug gauge on ID, micrometer on thickness, plus a visual for chipped edges. 18 seconds per piece, record included.

Item Value Note
Labour rateUSD 45/hour = USD 0.75/minLoaded, incl. floor space
Inspection time18 s/pcThree dimensions + visual
Cost per pieceUSD 0.22518 ÷ 60 × 0.75
Share of piece price15.8%of USD 1.42

A USD 1.42 spacer costs USD 0.225 to check. 100% on 2,000 pieces = USD 450, or 15.8% of the lot value.

That ratio is the fulcrum of the whole argument. On a USD 42 precision part the same 0.225 is 0.5% and nobody asks the question. It is low piece value plus high inspection share that makes this a real problem.

2. Three release tiers on one table

Direct cost first, risk later.

Method Sampling rule Pieces checked Cost/lot % of lot value Lead-time effect
100%Every piece2,000USD 45015.8%+0.5–1 day
AQL, general level IIISO 2859-1, lot 1,201–3,200 → code K → n=125, AQL 1.0 → Ac=3 / Re=4125USD 28.11.0%none
AQL, special level S-4Same lot → n=20, AQL 1.0 → Ac=1 / Re=220USD 4.50.16%none
Skip-lotSupplier report + our 5-piece recheck every 3rd lot5 (per 3 lots)≈ USD 2/lot0.05%none

On this table alone, skip-lot obviously wins. The table is missing the one column that decides it: what an escaped defect costs.

2.1 Escape cost: what one bad piece costs once it leaves

The failure modes here are an undersized bore (will not take the M4 stud) or an oversize thickness (wrong stack height). Where it gets caught changes everything:

Caught at Share Cost structure Per piece
Customer IQC60%Return freight 2 × USD 45 = 90 (one lot movement) + replacement at 1.42≈ USD 12/pc incl. fixed cost
Customer assembly line30%15 min line stop = USD 11 + expedited replacement USD 45 + swap labour≈ USD 56 per event
Customer's finished goods10%Teardown rework USD 1.85/pcUSD 1.85/pc

At the Cpk 0.83 scenario (12.4 defects per 2,000) the escape loss per lot works out to USD 164, or USD 13.22 per defect.

Note the ratio: escaping defect USD 13.22 vs inspection USD 0.225 — 59×. The instinct to inspect is correct. The catch is whether you can actually catch it.

3. The key insight: sampling is blind to process drift

This is the counter-intuitive part, and the part that pays.

Take a supplier running Cpk 0.83 on the bore: tolerance ±0.10 mm, mean offset +0.03 mm, σ = 0.028 mm. Probability of exceeding the upper limit is 0.62% — 12.4 defects in 2,000 pieces.

Now run AQL n=125, Ac=3 against that lot:

Lot condition Defect rate Expected hits in 125 Lot rejection probability
Process drift, Cpk 0.830.62%0.7750.80%
Process drift, Cpk 1.330.0066%0.0080.000002%
Batch accident (die chipped, 15%)15%18.7599.99%

How to read it: on a Cpk 0.83 process, 99.2% of lots pass sampling and all 12.4 defects ship. The USD 28.1 buys a 0.80% interception rate.

On a 15% batch accident, the same 125 pieces reject 99.99% of the time.

Sampling is a batch-accident detector, not a per-piece quality certificate. It guards against tool chipping, die wear and material lot changes — jumps between lots. It does not guard against a stable, off-centre process.

That is why plants that "have always sampled" still get complaints. Sampling is not the wrong tool; it is being used on the wrong problem.

A quieter version of the same trap: if your sampling plan reads "special level S-4, n=20", the cost is USD 4.5 and it still rejects 82% of a 15% accident lot. Cheap, and not useless — but against a 0.62% drift its rejection probability is 0.7%, indistinguishable from skip-lot. Before you sign the PO, check what n and Ac actually are. "AQL sampling" on its own means nothing.

4. Four costs side by side, annualised

Six lots a year. Batch-accident frequency assumed at 1 in 15 lots — FR4 is glass-filled and highly abrasive, so a punch realistically lasts 30,000–50,000 strokes, i.e. 15–25 lots at 2,000 pcs.

Method Inspection/yr Drift escape/yr Accident loss/yr Total/yr
100%2,7000162,716
AQL n=125169985161,170
Skip-lot129851581,155

Honest reading: sampling (1,170) and skip-lot (1,155) are a wash. 100% is more than double.

So why still recommend sampling? Two reasons, neither of them "it is cheaper":

  1. Variance, not mean. The 1-in-15 figure is an average. In a bad month — material lot change, worn die — it becomes 1 in 5, and skip-lot's annual loss jumps from 158 to 474 while sampling moves 16 to 48. Sampling buys variance reduction. No buyer is hurt by spending USD 15 more a year; everybody is hurt by a whole lot coming back in one quarter.
  2. Traceability. Sampling leaves a record — n, Ac, lot number, inspector. When something goes wrong you can show you released to a documented plan. Skip-lot leaves you with no evidence at all.

100% at more than double the cost is justified in exactly one case: Cpk below 0.71.

5. Four break-even points

For whoever has to defend this in a meeting.

5.1 100% vs skip-lot: defect rate 1.70%

USD 450/lot = p × USD 13.22 × 2,000
p = 450 / 26,440 = 1.70%

Above 1.70%, inspect everything. Below it, skip.

Translate 1.70% back into capability: bore ±0.10 mm with a 0.03 mm offset gives Cpk ≈ 0.71.

The 0.71 in the title is not a rule of thumb. It is this division.

5.2 Sampling vs skip-lot: one accident per 34 lots

USD 28.1/lot = f × (1,055 − 105)
f = 28.1 / 950 = 0.0296 ≈ 1 in 34 lots

If an accident arrives more often than once every 34 lots, sampling pays. Less often, the money is wasted.

FR4 punches run 15–25 lots, inside the threshold, so sampling is justified. Phenolic is far less abrasive — punches reach 60–80 lots — and there sampling may not pay. Same rule, opposite answer, because the material differs. That is why you calculate instead of copying.

5.3 Fix the process vs inspect forever: 2.3 lots

Re-shim the die: USD 380 once
Cpk 0.83 → 1.33 (p from 0.62% to 0.0066%)
Annual saving = 985 − 10 = USD 975
Payback = 380 / 975 = 0.39 yr ≈ 2.3 lots

100% inspection on 2.3 lots (USD 1,035) equals one die correction. If a supplier has sat near Cpk 0.8 while you inspected everything for a year, what you need is not stricter inspection. It is a die fix.

5.4 Tooling-charge amortisation: 2,535 pieces

Sample of 3 plus a full-dimensional first-article report: USD 180. Spread over 2,000 pieces that is USD 0.090/pc (6.3% of unit price); over 500 pieces it is USD 0.360 (25.4%).

The 5% threshold sits at 2,535 pieces (`180 ÷ (1.42 × 5%)`). Below that line the job should be quoted as small-batch, not as production. The thing to negotiate is not "can you waive it" but "spread it over how many pieces". At 12,000 a year it lands at USD 0.015/pc and the waiver stops mattering.

6. Four failure modes

Failure 1 — "Sampling passed" read as "process in control". At Cpk 0.83 the rejection probability is 0.80%, so passing is near-certain. Six consecutive passes prove only that no batch accident occurred. Capability has to come from the measured values in the first-article report plus Cpk over three lots — never from a sampling verdict.

Failure 2 — The sampling plan gets quietly downgraded in the PO. "AQL 1.0 sampling" lets the supplier choose general level II (n=125) or special level S-4 (n=20). Six times the cost, an order of magnitude of interception capability. Against a mild 3% drift, n=125 rejects 96% and n=20 rejects 12%. Write three things into the PO: standard number, inspection level, and n/Ac/Re. An AQL value alone writes nothing.

Failure 3 — 100% inspection mistakes detection for cure. USD 450 a lot, USD 2,700 a year, and the 12.4 defects found cost USD 4.34 to rework. Roughly USD 445 of the 450 is spent sorting and USD 4 fixing. 100% protects delivery, not capability — a tourniquet, not surgery.

Failure 4 — The first-article report only measures dimensions that carry a tolerance. An FAI typically lists 5–6 toleranced dimensions. Interference usually appears on untoleranced ones: under GB/T 1804-m an untoleranced linear dimension is ±0.2 mm, an untoleranced angle ±1°. A 0.3 mm-undersized fillet or a chamfer run square is on no drawing callout and in no report, and it fails at assembly. The first-article report must cover every functional dimension, every mating face, and at least two untoleranced dimensions with actual values. Costs ten minutes, not money.

7. Six clauses to put in the PO at prototype hand-off

Not an audit checklist — that one is in article 84. These are release clauses:

  1. Release method and sampling plan: standard (ISO 2859-1 / GB/T 2828.1) + inspection level (general II) + n/Ac/Re (125/3/4) + AQL (1.0), with a CTQ dimension list attached.
  2. First-article report content: full dimensions + material certificate (UL 94 V-0 and Tg for FR4) + at least two untoleranced dimensions + measured-point map.
  3. Cpk submission: for lots ≥ 2,000 pcs, the supplier submits Cpk on CTQ dimensions from three consecutive lots of ≥ 30 pieces, target ≥ 1.33. No data is treated as Cpk < 0.71 and inspected 100%.
  4. Rejection cost allocation: return freight, our inspection labour at USD 0.225/pc, and lead-time liability — state who pays. Without this clause, one rejection makes both sides lose.
  5. Tooling charge amortisation: USD 180 against the first N pieces, or refunded on annual volume. Define the trigger and the volume threshold.
  6. Tooling ownership: who funds the die, who owns it, whether it can be taken away at end of cooperation. Most often skipped, and the hardest knot when you change suppliers.

8. FAQ

Q1 — Must the first lot be inspected 100%?
No. Cpk ≥ 1.33 backed by three lots of data justifies sampling or skip-lot from lot one. Conversely, a supplier with no data should be treated as Cpk < 0.71 even if they claim 1.67. A Cpk without data is zero.

Q2 — Is AQL 1.0 too loose?
AQL is an acceptable quality level, not a defect ceiling. AQL 1.0 means the plan accepts a 1% defect rate 95% of the time. It governs sampling risk, not process capability. Use Cpk for capability.

Q3 — Does skip-lot mean no quality control?
Skip-lot presupposes a validated process plus a recheck loop. What we recommend is 5 pieces every third lot plus a quarterly Cpk, about USD 2 a lot. True skip-lot with no recheck is defensible only where a failed part has no functional consequence.

Q4 — Rework the defects found, or reject the lot?
Below 1.70% defect rate, rework at USD 0.35/pc beats a lot return (USD 180 freight plus delay). Above 5%, return the lot — that level signals a batch problem, and rework just pushes it one lot downstream.

Q5 — Our part is worth far more than USD 1.42. Does this still hold?
Yes, but the threshold moves. Inspection stays at USD 0.225 while escape cost scales with value. On a USD 10 part, 100% inspection is 2.25% of value and the balance tilts hard toward inspecting. Substitute your own three numbers for 450 / 13.22 / 2,000 and do the division.

9. Send a drawing, get two quotes

On a first order we quote two lead times: standard (including AQL sampling) and expedited (including 100% inspection), together with the CTQ list for the part and the measured Cpk from the previous lot, so you can check the arithmetic against your own figures.

To have a first-lot release plan assessed, send the drawing, lot size and annual volume and we will mark the recommended sampling plan and its cost on the quotation: contact us

Related reading: Article 91 — Lead Time & MOQ for Custom FR4, G10 and Phenolic Parts: how lead time decomposes, how MOQ is arithmetic, when to switch process · Article 90 — Machining Tolerance for FR4, G10 and Phenolic: the full ±0.20 / ±0.10 / ±0.15 basis, source of every specification used here · Article 89 — CNC Routing vs Laser vs Die Cutting: the process switch that usually happens at this exact hand-off · Article 94 — Insulation Washers and Spacers: the spacer specification used in this cost model · Product pages: FR4 glass fibre board, 3240 epoxy sheet, custom machining